PROFILE
  PLANT
  CERTIFICATIONS
  FUTURE PLANS
  REGULATORY
  MEDIA
Home Contact Us Site Map
 
  Plant
 
Essar Power's 515 MW power plant at Hazia
Essar Power Limited set up India's first new generation independent power project at Hazira, India in the early 1990s. The 515 MW natural gas fired combined cycle has consistently set new standards of excellence in the Indian power sector and meets the highest operating benchmarks. This environment friendly plant operates with a plant availability factor in excess of 94%. In addition to multi-fuel capability, the plant has the lowest manpower to megawatt ratio and one of the lowest capital costs per megawatt in India.
Flexible and efficient
The plant's design and construction are world class, as confirmed by independent international consultants. All our equipment comes from the world's best suppliers such as General Electric, Siemens and Honeywell. The plant is highly efficient and flexible. Both plant availability and the plant load factor are high and have been improving annually. Being India's first multi-fuel plant, it can operate simultaneously on naphtha and gas, which will be a major advantage once LNG becomes freely available. By switching over to LNG, our variable costs have fallen substantially, giving us one of the lowest cost of production in India. The government has notified Essar Power as an infrastructure company, giving us the advantage of lower interest charges.
High automation and skilled teams
Our plant is highly automated, giving us India's lowest manpower to megawatt ratio. Our lean, highly trained team is one of the best technical teams in the country today and is a key strength. Unlike other power producers who employ separate operations and maintenance contractors to run their power plants, our own internal team runs Essar Power's state-of-the-art equipment such as turbines, generators and auxiliaries with a high degree of automation. Safety and environment management are the top priorities at Essar Power. We are one of the few companies to receive the 'Sword of Honour', the British Safety Council's highest award; and the only power plant in India to receive the ISRS level-3 safety rating.
High technology , high efficiency
Independent international consultants have confirmed the plant's design and construction to be world class
The plant is highly efficient and flexible
Both plant availability and the plant load factor are high
The plant has the lowest 'Manpower to Megawatt Ratio' in India.
Multi-fuel plant, capable of operating on naphtha or gas.
The equipment that has been installed at Essar's power plant comes from the world's best suppliers General Electric, Siemens, Honeywell and Hanjung, at a total capital outlay of US$500 million. The Hazira combined cycle block consists of some of the world's most renowned manufacturer of power plant equipment including General Electric, Siemens, Honeywell and Hanjung having supplied equipment to Essar's power plant. The total captive outlay on the plant is over US$ 500 million.
Three dual-fuel GE-frame 9E gas turbine generators nominally rated at 110 MW, at an average site ambient temperature of 28 degrees Celsius. Essar commissioned two generators in August 1995 and the third during November 1995.
Three dual-pressure, unfired heat recovery steam generators (HRSG) supplied by Korean Heavy Industries and Construction Company Ltd, (HANJUNG)
One GE 185MW condensing steam turbine generator
Processes
 
Home | Profile | Plants | Certifications | Future Plans | Media | Site Map | Contact Us
copyrights © 2004 Essar group of companies All rights reserved.